Sign In | Join Free | My gimpguru.org
China Yuhong Group Co.,Ltd logo
Yuhong Group Co.,Ltd
Yuhong Holding Group Co.,LTD
Verified Supplier

13 Years

Home > Boiler Tube >

EN10305-1 E235+N Precision Seamless Tube For Automobile Nbk Surface

Yuhong Group Co.,Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

EN10305-1 E235+N Precision Seamless Tube For Automobile Nbk Surface

  • 1
  • 2
  • 3

Brand Name : YUHONG

Model Number : E235+N,ST37.4,ST52.4

Certification : ABS, GL, DNV, NK, PED, AD2000, GOST9941-81, CCS, ISO 9001-2008

Place of Origin : CHINA

MOQ : 100KGS

Payment Terms : L/C, T/T

Delivery Time : 7DAYS

Packaging Details : Plywood case,Bundle

OD : 3/4" (19.05), 1"(25.4) , 1-1/4"(31.75), 1-1/2"(38.1), 2" (50.8), 2-1/2"(63.5) , 3" (76.2)

USAGE : Heat Exchanger Tube, Boiler Tube

STANDARD : EN10305-1

MATERIAL : ST37.4, ST52.4,E235+N

WT : 0.89,1,1.24,2.11MM....

Contact Now

EN10305-1 E235+N PRECISION SEAMLESS TUBE FOR AUTOMOBILE NBK SURFACE

Description:
Precision steel tube
Grade:
St 35 / St37 / St37.4 / St45 / St 52 / St52.4/ E215 / E235 / E355
Precision in size,Bright for the surface, high ability of mechanical performance
Standard: DIN 2391, EN10305-1, EN10305-4, BS 6323, ISO 8535
DIN2391 Precision steel pipe
STEEL GRADE: ST30Si, ST30Al, ST35, ST37, ST37.4, ST45, ST52, ST52.4, etc
Size:(mm)
Out Dimensions: 6 mm ~ 350 mm
Wall Thickness: 0.8 mm ~30mm
Length: Fixed(6m,9m,12,24m) or normal length(5-12m)

Final supply conditions:
Cold finished(hard)BK
Tubes do not undergo heat treatment following the final cold forming and, thus, have a rather high
resistance to deformation.
Cold finished(soft)BKW
The final heat treatment is followed by cold drawing involving limited deformation. Appropriate further
processing allows a certain degree of cold forming (e.g. bending, expanding)
Cold finished and stress-relieved BKS
Heat treatment is applied following the last cold forming process. Subject to appropriate processing
conditions, the increase in the residual stresses involved enables both forming and machining to a certain
degree.
Annealed GBK The last cold forming process is followed by annealing in a controlled atmosphere.

Normalized NBK
The last cold forming process is followed by annealing above the upper transformation point in a controlled

atmosphere.

Chemical Composition

Steel Grade Chemical Components (%)
Steel Name Steel Number C

max.

Si

max.

Mn

max.

P

max.

S

max.

AL

min.

E215 1.0212 0.10 0.05 0.7 0.025 0.025 0.025
E235 1.0308 0.17 0.35 1.2 0.025 0.025 /
E355 1.058 0.22 0.55 1.6 0.025 0.025 /

Delivery Conditions

The tubes shall be manufactured from hot finished seamless tubes by cold drawing or other suitable processes. The tubes shall be supplied in one of the delivery conditions as follows:

Designation Symbol Description
Cold drawn/hard +C No heat treatment after the final cold drawing process.
Cold drawn/soft +LC After the final heat treatment there is a suitable drawing pass.
Cold drawn and stress relieved +SR After the final cold drawing process there is a stress relief heat treatment in a controlled atmosphere.
Annealed +A After the final cold drawing process the tubes are annealed in a controlled atmosphere.
Normalized +N After the final cold drawing operation, the tubes are normalized in a controlled atmosphere.

Delivery Condition Symbol in accordance with EN10305 and DIN2391

Symbol in accordance with EN 10305 Symbol in accordance with DIN2391
+C BK
+LC BKW
+SR BKS
+A GBK
+N NBK

EN10305-1 E235+N Precision Seamless Tube For Automobile Nbk Surface


Product Tags:

EN10305-1 E235+N Precision Seamless Tube

      

E235+N Precision Seamless Tube

      

automobile nbk surface precision seamless tube

      
Quality EN10305-1 E235+N Precision Seamless Tube For Automobile Nbk Surface wholesale

EN10305-1 E235+N Precision Seamless Tube For Automobile Nbk Surface Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Yuhong Group Co.,Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)